Project Energy City Sale Process
A 200 MW / 400 MWh standalone battery storage project in Midland County, Texas, offered on behalf of American Wind and Solar.
200 MWBattery Storage (400 MWh)
138 kVOncor POI
Q4 2027Target COD
18.7 acresLeased Site
Overview
Fractal Advisory, on behalf of its client American Wind and Solar, invites qualified buyers to participate in the Energy City sale process. The project is currently under exclusivity.
- Standalone 200 MW / 400 MWh (2-hour) lithium-ion BESS
- Oncor 138 kV POI with 204.9 MWac available capacity
- Interconnection studies complete; awaiting draft SGIA
- Lease signed for 15 years plus two 5-year extensions
- Environmental studies, Phase I ESA and permitting complete
- High potential for data center siting
- Target FNTP Q1 2027 and target COD Q4 2027
Project Details

Project Energy City
- Capacity
- 200 MW / 400 MWh (2-hour)
- Location
- Midland County, TX
- Market
- ERCOT West
- Target FNTP
- Q1 2027
- Target COD
- Q4 2027
- Utility
- Oncor
- POI
- 138 kV, Texaco MABEE Tap to Mariensfield
- POI capacity
- 204.9 MWac
- Queue
- 26INR0231
- Interconnection
- Studies complete; awaiting draft SGIA
- Site
- ~18.7 acres
- Land control
- Lease signed (15 + 5 + 5 years); purchase possible
- Permitting
- Complete; permitted by right
How to Participate
1
Review the Teaser
Download the project teaser for a summary of the opportunity.
2
Sign the NDA
Sign and return the non-disclosure agreement to Aaron Barker at aaron@fractalba.com.
3
Access the Data Room
Receive the CIM, project model and process letter, along with access to the virtual data room.
The process letter sets out the timing and guidelines for submitting non-binding offers to advance to Phase 2 due diligence.
Selling a Project? Schedule an Introductory Call
Contact Us